/MRSS/SGE_PN_MNT - Create / Maintain planning nodes in MRS system
Vendor Master (General Section) SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3upThis documentation is copyright by SAP AG.
Purpose
You use this report to import work centers and their capacities from SAP ERP to SAP MRS as capacity planning nodes. In each case, you have to enter the work center and the plant for which you want to transfer data.
To define concrete break times, maintain the IMG activity at Multi Resource Scheduling → Set Up Scheduler Workplace → Define Breaks for Work Centers.
Note: For the work centers themselves, you can define only the duration of the breaks and not the actual start time of the break.
If you have defined concrete break times, the system specifies the time between the start and end (start+ duration) as a non-availability for the capacity calculation. If you have not defined concrete breaktimes, the system reduces the capacity of the work center by the number of resources multiplied by theduration of the break. The system then divides this capacity reduction equally across the opening times of the work center.
Integration
Prerequisites
Features
Selection
Standard Variants
Output
Activities
Example