/RPM/MIGRATION_CROOM - xRPM Migration: Migrate cRoom
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up Fill RESBD Structure from EBP Component StructureThis documentation is copyright by SAP AG.
Purpose
This report enables you to migrate a collaboration room (cRoom) for SAP xRPM 2.0 projects to a cRoom for portfolio items in SAP xRPM 4.0.
Integration
Prerequisites
Before a cRoom migration, migrate SAP xRPM 2.0 projects to portfolio items in SAP xRPM 4.0.
Note: Migration is possible in case of one box upgrade (that is both the systems are deployed on thesame portal server). Migration is not possible in case of two box upgrade (that is both systems are deployed on different portal servers).
Features
Selection
General Options
Test mode (no DB-update)
- ,,If this option is checked, no database updates occur
- ,,If this option is unchecked, the database is updated and logs are stored
Project Selection
Project category: Select a project category from the dropdown list. If you leave this field blank, cRooms for all projects are migrated.
Project subcategory: Select a single project subcategory or a range of project subcategories from the dropdown list. If you leave this field blank, cRooms for all projects under the selected categories are migrated.
Project external ID:,,Select a single project ID or a range of project IDs from the dropdown box. If you leave this field blank, cRooms for all projects are migrated.
Standard Variants
Output
cRooms for projects in SAP xRPM 2.0 are migrated as cRooms for portfolio items in SAP xRPM 4.0.
Activities
Example
RFUMSV00 - Advance Return for Tax on Sales/Purchases BAL_S_LOG - Application Log: Log header data