/SAPAPO/VS_HIST_LIST - Display the Change History
General Data in Customer Master ROGBILLS - Synchronize billing plansThis documentation is copyright by SAP AG.
Purpose
You can use this report to generate a history of all changes that were made to shipments. For example, this history is useful when changes are made to delivery dates from TP/VS in SAP R/3.
Integration
Prerequisites
Changes to shipments are only recorded if you enter a change history value (in days) in Customizingthat is not equal to zero. To do this, choose the following in SAP APO Customizing: AdvancedPlanning and Optimization -> Transportation Planning/Vehicle Scheduling (TP/VS) -> Basic Settings -> Basic Settings for Vehicle Scheduling.
For more information about changing delivery dates from TP/VS in SAP R/3, see the SAP Library underSAP Advanced Planner and Optimizer (SAP APO) -> Transportation Planning/Vehicle Scheduling -> Vehicle Scheduling -> Planning -> Changes to Delivery Dates in SAP R/3 from TP/VS.
Features
Selection
Standard Variants
Output
Activities
Example
General Material Data PERFORM Short Reference
This documentation is copyright by SAP AG.
Length: 1113 Date: 20120523 Time: 205913 triton ( 86 ms )






