/SAPAPO/VS_HIST_LIST - Display the Change History

General Data in Customer Master   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.

Purpose

You can use this report to generate a history of all changes that were made to shipments. For example, this history is useful when changes are made to delivery dates from TP/VS in SAP R/3.

Integration

Prerequisites

Changes to shipments are only recorded if you enter a change history value (in days) in Customizingthat is not equal to zero. To do this, choose the following in SAP APO Customizing: AdvancedPlanning and Optimization -> Transportation Planning/Vehicle Scheduling (TP/VS) -> Basic Settings -> Basic Settings for Vehicle Scheduling.

For more information about changing delivery dates from TP/VS in SAP R/3, see the SAP Library underSAP Advanced Planner and Optimizer (SAP APO) -> Transportation Planning/Vehicle Scheduling -> Vehicle Scheduling -> Planning -> Changes to Delivery Dates in SAP R/3 from TP/VS.

Features

Selection

Standard Variants

Output

Activities

Example



General Material Data   PERFORM Short Reference  
This documentation is copyright by SAP AG.


Length: 1113 Date: 20120523 Time: 205913     triton ( 86 ms )