/SEPC/R_XFER_PROJ_PRIM - Transfer Projects

BAL_S_LOG - Application Log: Log header data   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by SAP AG.

Purpose

With this report you can transfer data between the ERP system and Primavera P6.

Integration

Prerequisites

Features

Selection

Standard Variants

Output

Activities

  1. Enter the project definition.
  2. Choose the transfer mode:
  • If you choose Interactive Selection a list of orders will be returned based on your selection criteria allowing you to select which orders to transfer.

  • If you choose Automatic Transferyour selection criteria will be evaluated and all resulting orders will be transferred.

  1. Choose the transfer type:
  • SAP ERP to P6

During the SAP ERP to P6 transfer SAP Enterprise Project Connectionwill write data from the SAP ERP fields to the Primavera P6 fields. SAP Enterprise Project Connection will apply business rules to determine if the data in the mappings needs to be created or update.
See the User Guide for the tables with the field mapping and the business rules .
  • P6 to SAP ERP

The SAP Enterprise Project Connection will retrieve the projects and activities that correspond to the parameters selected in the order status and order selection.
It will map the Primavera P6 fields to the SAP ERP fields.
The system writes a record of all data that transferred from SAP ERP to Primavera P6 or vice versa. Call report SEPC/R_XFER_RESULTS to see the result.
For further information see SAP Enterprise Project Connection User Guide.

Example



PERFORM Short Reference   CPI1466 during Backup  
This documentation is copyright by SAP AG.


Length: 2071 Date: 20120524 Time: 024643     triton ( 72 ms )