/SAPAPO/OM_SPP_PUR_REQ_MODIFY - Create/Change/Delete SPP Purchase Requisition Orders

TXBHW - Original Tax Base Amount in Local Currency   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.

Functionality

This function module enables you to create, change, and delete SPP (Spare Parts Planning) purchase requisitions.

SPP_PUR_REQ_MODIFY processes SPP purchase requisitions only (order type gc_om_spp_pur_req).

SPP purchase requisitions have the following special properties:

  • Defined structure: For each order object, there are n schedule lines, each with an activity, an input node, and an output node.

  • All input nodes have the same ATP category and the same ATP category type.

  • All output nodes have the same ATP category and the same ATP category type.

  • All output nodes are in the same pegging area.

  • There is only one SPP purchase requisition for each pegging area/CATEGORY_TO combination.

  • SPP purchase requisitions are not involved in pegging, do not update the ATP time series, are not copied to SAP systems using CIF, and do not trigger alerts.

  • SPP purchase requisitions can be created, changed, or deleted by /SAPAPO/OM_SPP_PUR_REQ_MODIFY only.Deletions are also possible with /SAPAPO/OM_ORDER_CHANGE (method APO_DELETE). If you attempt to modifyan SPP purchase requisition with a different LCA routine, this LCA routine will return the return code 342 = om_spp_not_allowed: SPP orders cannot be changed.

The function module /SAPAPO/OM_SPP_PUR_REQ_MODIFY works as follows:

  • IT_USE_ORDER_IDS = true: The specified ORDERIDs are used.

  • IT_USE_ORDER_IDS = false: liveCache determines the GUIDs for the order from the specified pegging area/CATEGORY_TO combination.

  • Creating a new order: If an order does not yet exist with this pegging area/CATEGORY_TO combination, a new SPP purchase requisition is created with the appropriate schedule lines.

  • Change/delete: If an SPP purchase requisition with this pegging area/CATEGORY_TO combination alreadyexists, then those schedule lines (of the order) whose time (SPP_LINE_TIME_TO) is in the specified selection interval [IV_START_TIME, IV_END_TIME] are replaced by the schedule lines in the table IT_SPP_PUR_REQ_LINE.

If the table IT_SPP_PUR_REQ_LINE is empty and the order no longer has any schedule lines after the replacement(for example, the selection interval [IV_START_TIME, IV_END_TIME] = [GC_MINTIME, GC_MAXTIME]), the order is deleted.

This means that an SPP purchase requisition always has at least one schedule line.

Example

Notes

Further information


Parameters

ET_RC
IS_GEN_PARAMS
IT_SPP_PUR_REQ_HEADER
IT_SPP_PUR_REQ_LINE
IV_END_TIME
IV_SIMSESSION
IV_START_TIME
IV_USE_ORDER_IDS

Exceptions

LC_APPL_ERROR
LC_COM_ERROR
LC_CONNECT_FAILED

Function Group

APO/SAPLOM_SPP

Fill RESBD Structure from EBP Component Structure   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.


Length: 3409 Date: 20120525 Time: 090615     triton ( 138 ms )