/SAPAPO/RRP_ATPTREE_CONVERT - Convert ATP Tree
General Material Data Fill RESBD Structure from EBP Component StructureThis documentation is copyright by SAP AG.
Functionality
The transferred import parameter (structure IS_SCHEDLINE) contains the schedule line information for the PP/DS order creation per requirements group.
The planning version and transactional simulation are set. The actual conversion of the ATP tree structuresand the PP/DS order creation take place with the call of the function module /SAPAPO/RRP_ATPNODE_CONVERT.After the conversion has been performed successfully, the PP/DS orders are created in SAP liveCacheand the relevant ATP tree structure is deleted. If at least one PP/DS order could not be created during the conversion, the entire ATP tree structure is not converted.
Example
Notes
The conversion logic of the ATP tree structures is documented in the function module /SAPAPO/RRP_ATPNODE_CONVERT.
Further information
Parameters
ET_CONVERTED_ORDERSET_FAILED_ORDERS
IS_CONTROLPARAMS
IS_SCHEDLINE
IV_DELETE_TREE
IV_MERGE
IV_READ_TUBE
Exceptions
ERRORFunction Group
APO/SAPLRRP_ATP2PPDSrdisp/max_wprun_time - Maximum work process run time CL_GUI_FRONTEND_SERVICES - Frontend Services
This documentation is copyright by SAP AG.
Length: 1697 Date: 20120525 Time: 102012 triton ( 127 ms )






