CL_CCY_PSEG_CONTROL_S2L - Planning Control for Control Cycle
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by SAP AG.
Functionality
The class CL_CCY_PSEG_CONTROL_S2L is responsible for the planning control of a control-cycle-basedsupply segment.
Relationships
Example
Notes
Further information
BAL_S_LOG - Application Log: Log header data General Material Data
This documentation is copyright by SAP AG.
Length: 406 Date: 20120526 Time: 095218 triton ( 59 ms )






