SAP® Documentation

Single view

/ISDFPS/WPSORR_CENTRAL_GET - Conversion Rule for Work Centers

rdisp/max_wprun_time - Maximum work process run time   Vendor Master (General Section)  
This documentation is copyright by SAP AG.
SAP E-Book

Purpose

This report is used to transfer conversion regulations for work centers from the central system to a decentralized system.

Transaction:/ISDFPS/MEBOR
Report:/ISDFPS/WPSORR_CENTRAL_GET

Note:

  • This transaction can be started only in a decentralized system.
  • The report runs when a decentralized system is set up for the first time. However, it can be repeated at any time in the decentralized system. If entries have already been transferred in the decentralized system, the user is informed that
conversion regulations already exist in the decentralized system and asked whether the data should be replaced.
  • Posted entries are displayed as an ALV list.

Integration

Prerequisites

Features

Selection

Standard Variants

Output

Activities

Example






Fill RESBD Structure from EBP Component Structure   BAL Application Log Documentation  
This documentation is copyright by SAP AG.

Length: 1335 Date: 20200226 Time: 150638     sap01-206 ( 14 ms )

Our Service

Looking for Support? Questions?

The

Consolut

Callback-Service

Leave us your contact details and we will call you back. Panels marked with * are mandatory.