SAP® Documentation

Single view

CNVMBTREORG014 - Subproject name in deleted package &1 that has status finished. - CNVMBTREORG 014

PERFORM Short Reference   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book

Diagnosis

When a package is deleted then the subproject name will be deleted from table cnvmbtpack. Anyhow a package with status finished was selected from table cnvmbtpack. This is an inconsistency in the table cnvmbtdelref and has to be corrected. Check that the package was really deleted. If so, remove the subproject name from table cnvmbtpack. If the package was not deleted so far then fix the status in table cnvmbtdelref.

System Response

Procedure

Procedure for System Administration






General Material Data   Vendor Master (General Section)  
This documentation is copyright by SAP AG.

Length: 628 Date: 20191117 Time: 035905     sap01-206 ( 12 ms )

Our Service

Looking for Support? Questions?

The

Consolut

Callback-Service

Leave us your contact details and we will call you back. Panels marked with * are mandatory.