K3048 - Reference cost estimate cannot be changed - K3 048

ROGBILLS - Synchronize billing plans   General Material Data  
This documentation is copyright by SAP AG.
SAP E-Book

Diagnosis

In the costing variant, no reference variant was entered. A cost estimate (reference cost estimate) created with this variant cannot be changed.

System Response

Procedure

The cost estimate must be created afresh.